Question 1:
a. Make
a checklist of all elements required when applying for a construction permit
SOLUTION:
1.
Project
brief including a description of methods and techniques applied except for
category 1
2.
Site
plan including landscaping topography
3.
Copy
Geotechnical report except for category 1
4.
Copy
of environmental impact assessment report except for category 1
5.
Architectural
drawings
6.
Structural
design comprising plans and calculations except for category 1
7.
Mechanical,
electrical, sanitation technology and fire safety plans as applicable except
for category 1
8.
Bill
of quantity and cost estimation except for category 1
b. According
to the Rwanda building code, define the increment
building
SOLUTION:
Any dwelling house that for reasons
of affordability is to be constructed in stages in such manner that in its
intermediate stage the house can be occupied by its owner for the limited
specified period of time necessary to complete it and that is intended, in its
final approved form, to have a total plan area of not more than 80m2
c. For
an increment building only one occupation permit will be provided at the
completion of the project. True or false. Explain your answer
SOLUTION:
True.
d. What
are the types of construction permit used in Rwanda?
SOLUTION:
Subject to the provisions of Article 83 of the Law No. 10/2012 of
02/05/2012 Governing Urban Planning and Building in Rwanda, a permit
shall be required for:
1. Development /New
construction;
2.
Extension (vertical/ horizontal);
3.
Refurbishment of existing building with structural alteration;
4.
Rehabilitation and refurbishment without structural alteration;
5.
Occupancy;
6.
Change of use/occupancy; and
7. Demolition (full or
partial).
Question 2:
a. Define
a critical load for members in compression
b. What
is the difference between expansion joint and seismic joint of a building?
c. According
to the Rwanda building code, is the inspection of a foundation of a new
building mandatory? Yes, or not?
d. According
to the same code for big construction projects, is it the responsibility of the
contractor or that of supervisor to apply for the construction permit to the
competent authority?
SOLUTION:
According to the Rwanda building
code, the construction permit application must be done by the client.
e. Make
the difference between the results from the dynamic penetrometer and those from
the direct shear.
Question 3:
Look
at the beam in reinforced concrete (its self-weight is neglected) on the figure
above. Provide diagrams of shear and bending moments in elastic domain, and
propose a sketch of reinforced based on the diagrams (without any further
design)